01. Is my business suitable to partner with Green Roof?

Our ideal client profile is:

1. Reputable business
2. Average Electricity Consumption is at least VND 400 milion/month

If your business fits this profile, please send us an email at info@greenroof.vn or simply call our hotline at (+84)86 811 5599

02. Can my roof withstand the weight?

This is one of our first checks during our site visit. Our structural engineers will evaluate your building, roof strength and other factors to determine if solar system can be installed as well as the right type of mounting structure and equipment suitable for your site. A third party will also come to check the roof structure after signing the contract.

03. Do I need to clean and manage the system?

Not at all. We will take care of all operations and maintenance of the system including cleaning and preventive maintenance.

04. What happens if my roof is damaged during installation?

We have an experienced international team and a strong company focus on design and process so this is extremely unlikely. However we would ensure we would cover any unlikely damage through insurance so there is zero risk to you.

05. Do I need to get local permits to install solar rooftop on my building?

No, let us take care of all that for you. Apart from designing, installing and operating the system, our team manages all local permitting and compliance to ensure a truly hassle-free experience for you.

06. Will this mean disconnecting my current power connection to EVN?

Not at all. The solar system will augment the power supply and be the first point of supply to your facility. The existing grid connection will continue to supply power to fulfill additional requirements including power beyond solar peak hours.

07. What happens if I need to sell or move from this building?

We have provisions for this in our contract; the most simple solution would be for the new owner to take over the contract, but we have other options too in case they don’t wish to.

08. If I want to buy the system after several years, what is the redemption fee?

Yes, The market value per MWp will be mentioned in the PPA. If you choose to do so, we will also do our best to hand over the system and all of related contracts and O&M instructions

9. Will construction and installation affect the production activities below?

Absolutely not. However, we will need to shut down the electrical system for about 1-2 hours for connection. We will notify you and both parties agree on a suitable time. If necessary, we can flexibly transfer construction hours to the time frames when the factory has the least production i.e. Sunday/holidays

10. Will installing a solar power system affect my roof structure? Does the system cause the roof to leak? If yes, who will bear the repair cost?

Before installation, we will hire a 3rd party to evaluate the roof structure of the factory to see if it is suitable for installation (cost is borne by Green Roof). In case the roof structure is not eligible, we may consider paying the cost of renovating the roof structure; however, the offer for customers will be adjusted. In addition, the installation of a solar power system helps in reducing the temperature below the roof by 5-7 degrees, and reduces the environmental impact on the roof, thereby increasing the life of the roof. In the event that it is proven that the roof is damaged or leaking due to Green Roofs fault, then Green Roof will bear the cost of this repair.

Latest News

Prime Minister Urges Immediate Resolution of Obstacles Facing Renewable Energy Projects in 9 Localities and Multiple Ministries

In an effort to remove obstacles for renewable energy projects, mobilize resources for the national economy, and address concerns raised by businesses and localities, the Prime Minister has issued a directive requiring swift action from relevant authorities. Permanent Deputy Prime Minister Nguyễn Hòa Bình, on behalf of the Prime Minister, has signed Official Telegram No.. . .

Rooftop Solar Power in Industrial Parks: In Need of a Policy Boost

Rooftop solar power systems in industrial parks hold significant development potential, driven by the growing demand for clean energy and the decreasing cost of investment. However, in practice, there remain numerous regulatory and operational barriers related to investment, installation, grid connection, and electricity sales within industrial zones that must be promptly addressed. Rooftop solar power. . .

Series of Renewable Energy Projects at a Standstill, Prime Minister Urges Immediate Resolution

The Prime Minister has tasked the Minister of Industry and Trade and the General Director of Vietnam Electricity (EVN) to review, propose, and clearly recommend solutions for the obstacles related to Feed-in Tariff (FIT) pricing. Standing Deputy Prime Minister Nguyen Hoa Binh has just signed an official dispatch from the Prime Minister, requesting relevant ministries. . .

Rooftop Solar Power: An Effective Cost-Saving Solution for Northern Vietnam

Rooftop solar power systems based on the self-generation and self-consumption model are becoming an increasingly proactive energy solution for households and businesses across Northern Vietnam. Not only do they help reduce electricity bills, but these systems also contribute to easing the load on the national power grid, supporting sustainable development goals and the transition to. . .